Commercial

Contract furniture for commercial spaces where appearance, performance and reliability all matter.

These projects demonstrate Mulberry’s ability to deliver tailored furniture solutions for busy, professional environments.

Westminster Abbey – Staff & Back-of-House Spaces

Overview

This project involved the supply of furniture for staff areas within Westminster Abbey, one of the UK’s most iconic and historic buildings.

The brief focused on creating comfortable, functional spaces for staff, including lounges, meeting booths, and dining areas, supporting those working behind the scenes in a high-footfall environment.

The Challenge

Working within a heritage setting introduced a different set of considerations.

The furniture needed to:

  • Complement the character of a historic environment
  • Provide comfort for staff use throughout the day
  • Withstand consistent, high levels of use
  • Be suitable for a variety of spaces, including lounges, dining areas, and meeting booths

 

Balancing modern functionality with the expectations of a world-renowned site was key.

The Solution

A coordinated furniture scheme was developed to suit the different staff areas while maintaining a consistent look and feel.

Key elements included:

  • Comfortable lounge seating for staff breakout spaces
  • Meeting booths designed for informal collaboration
  • Dining furniture suited to high-use environments
  • Durable materials selected for long-term performance

 

The overall approach focused on creating welcoming, practical spaces that support day-to-day staff needs.

Project Delivery

Furniture was supplied and installed in line with the project programme, ensuring minimal disruption within a busy operational environment.

Close coordination with the site team ensured the installation aligned with the requirements of a heritage setting.

The Outcome

  • Comfortable, functional staff environments within a historic setting
  • Durable furniture suited to high-footfall, daily use
  • Cohesive design across multiple back-of-house areas
  • A balance of modern comfort and heritage sensitivity

 

This project demonstrates the ability to deliver practical, high-quality furniture solutions across a wide range of environments, including some of the UK’s most prestigious locations.

Elevating Elegance with Vinyl Wraps and Window Film at Marks Sky Bar in Eltham

Overview

Mulberry Contract Furniture was appointed to deliver a vinyl wrap and window film installation at Marks Sky Bar in Eltham, supporting a wider interior upgrade to enhance the venue’s premium look and feel.

The project focused on elevating key visual elements within the space while maintaining functionality, durability, and a cohesive design aesthetic.

The Brief

Marks Sky Bar required a solution that would:

  • Enhance the overall aesthetic of the venue
  • Bring secondary areas, including the lift, in line with the bar’s interior design
  • Introduce branding and privacy to balcony glazing
  • Be delivered to a high standard suitable for a premium hospitality setting

 

The client wanted a refined, luxurious finish that complemented the existing interior.

The Solution

Mulberry proposed a combination of vinyl wrap and custom window film to achieve the desired transformation without structural alterations.

Vinyl Wrap

A rose gold vinyl wrap was selected to upgrade the lift finish, replacing the standard chrome appearance. This provided a more luxurious and cohesive look, aligning the lift with the bar’s interior design and overall ambience.

Window Film

Custom window film featuring the bar’s branding was installed to the balcony glazing. This served a dual purpose:

  • Enhancing visibility and branding from outside
  • Providing privacy for guests seated at high stools on the balcony

 

Both solutions delivered a strong visual impact while remaining practical and durable for a busy hospitality environment.

Project Delivery

All vinyl wrap and window film installations were carried out with precision and attention to detail. The works were completed efficiently, ensuring minimal disruption to the venue while achieving a flawless finish across all treated surfaces.

The Outcome

  • A cohesive, high-end aesthetic throughout the venue
  • Lift finishes upgraded to match the bar’s interior design
  • Improved branding visibility and guest privacy on the balcony
  • No need for replacement or structural changes

The completed project enhanced the overall customer experience, reinforcing Marks Sky Bar’s premium positioning from arrival through to service areas.

Restoring Elegance: Chair Re-upholstery Project for JP Morgan's London Head Office

Overview

Mulberry Contract Furniture was appointed to deliver a chair re-upholstery programme for JP Morgan’s London Head Office, refreshing existing seating while minimising disruption to a live corporate workplace.

The project involved the collection, refurbishment, and return of 50 chairs, all completed within a two-week turnaround.

The Challenge

JP Morgan wanted to retain their existing chairs while upgrading the look and feel of the workspace. The solution needed to:

  • Extend the lifespan of existing furniture
  • Align with the office’s interior design and branding
  • Be delivered quickly to avoid operational disruption
  • Maintain a high standard of finish appropriate for a corporate headquarters

 

Speed, quality, and reliability were critical.

The Solution

A full re-upholstery programme was recommended as a sustainable and cost-effective alternative to replacement.

The scope included:

  • Collection of 50 chairs from JP Morgan’s London office
  • Re-upholstery using a fabric selected by the client
  • Skilled craftsmanship to ensure consistency and durability
  • Comprehensive quality control checks prior to return

 

Temporary replacement seating was offered as part of the service to support business continuity during the refurbishment period.

Project Delivery

All chairs were collected, refurbished, and returned within two weeks of initial collection. The programme was carefully coordinated to minimise disruption, with clear communication around logistics and timelines.

Each chair was inspected before return to ensure it met Mulberry’s quality standards and JP Morgan’s expectations.

The Outcome

  • 50 chairs returned in as-new condition
  • Workspace aesthetics refreshed without full replacement
  • Minimal disruption to a live corporate environment
  • A cost-effective and sustainable solution

The completed project demonstrates how re-upholstery can provide a high-quality, efficient alternative to purchasing new furniture in corporate workplaces.

Hospitality Interiors

Overview

Mulberry Contract Furniture was appointed to resolve a finish issue to a newly installed bar at Marylebone Theatre, working alongside an interior designer specialising in the hospitality sector.

Following installation, the original bar finish did not meet the desired aesthetic. With the theatre scheduled to reopen imminently after an extended refurbishment period, a fast, high-quality solution was required without removing or replacing the existing bar structure.

The Brief

The interior designer and venue team required a solution that would:

  • Achieve the correct visual finish quickly
  • Avoid replacement or structural alterations
  • Be installed within days, not weeks
  • Meet the quality expectations of a premium hospitality venue

The reopening date was fixed, with no flexibility in the programme.

The Solution

Mulberry recommended the use of vinyl wrap to refurbish the bar surface. This approach allowed the existing joinery to be retained while delivering a completely new look.

Vinyl wrap was selected for its:

  • High-quality visual finish
  • Versatility across multiple surface types
  • Wide range of finishes, including wood-grain and metallic effects
  • Speed of installation compared to full replacement

 

The selected finish was carefully chosen to complement the theatre’s interior and overall design scheme.

Project Delivery

From initial contact, Mulberry supplied and installed the vinyl wrap within one week. The works were carried out efficiently and to a high standard, ensuring the bar was completed in time for the theatre’s reopening and the launch of a new show.

Attention to detail during installation ensured a seamless, professional finish across all treated surfaces.

The Outcome

  • 50 chairs returned in as-new condition
  • Workspace aesthetics refreshed without full replacement
  • Minimal disruption to a live corporate environment
  • A cost-effective and sustainable solution

 

The completed project demonstrates how re-upholstery can provide a high-quality, efficient alternative to purchasing new furniture in corporate workplaces.